Browsing Archive: May, 2015

Bridge Design

Posted by Rupert Connor on Tuesday, May 19, 2015, In : Bridge 

Here are a couple of screenshots of our bridge design taken from our Solidworks drawing. To give a sense of scale, the main beams (shown in grey) are about 10 feet (3metres) long and 6 inches (150 millimetres) deep. We're waiting for the weather to get warmer and drier before concreting the holding down bolts into the abutments. We're still hearing the phrase 'risk of frost' on the weather forecast in this part of the world.


Continue reading ...